Septic rules in Missouri
What the state says about septic work, with the page each rule comes from. It's a summary of the published rules, not legal advice, and your county's health department can have rules of its own.
Updated November 20, 2026
On this page: 7 sections
Check the license before you hire
Anyone who installs a new onsite system, or does a major modification or repair, must be registered with the Missouri Department of Health and Senior Services (DHSS). The registered professional is given an ID card, which "can be requested for verification after completing the required trainings". The DHSS page has a "Find a Professional" link for looking up a registered professional.1
Christian County's health department offers a Septic Installer Exam "for installers that wish to be licensed with the State of Missouri and to install wastewater systems in Christian County".2 In Jasper County, a homeowner who does not do the work must use "a state and county licensed septic installer" from the county list, and the office at (417) 358-0480 can provide an updated list of septic installers.3 In Boone County, installers must ask to be added to the Boone County Resource Management list of installers.4
What protects you when you hire
If a septic company sells you a system or service at your home on credit, Missouri's home solicitation law lets you cancel until midnight of the third business day after you sign.5-6 The right does not apply if you asked for the work without delay because of an emergency, the seller has in good faith made a substantial start, and the goods cannot be returned in substantially as good condition.5 Within ten days after a cancelled home solicitation sale, the seller must return your payments and any note marked "cancelled".7 Unless you request service without delay in an emergency, the seller must also have you sign a written agreement dated the day you actually sign it, with a statement of your rights.8
Before taking any payment, a contractor who contracts directly with you must give you a written notice in ten-point bold type about lien waivers.9 If you pay a subcontractor or supplier on a lien claim for work the contractor was already paid for, you have a claim against that contractor.10 If you buy merchandise for personal, family or household purposes and lose money or property through a practice declared unlawful by section 407.020, you may sue for actual damages in the circuit court where the seller lives or where the deal happened.11
Permits
A DHSS construction permit application is required before installing or repairing most onsite systems.12 Systems must use criteria "equal to or better than Missouri's Minimum Construction Standards". In most counties, the local health department issues the permit, and in the others another agency does, such as a sewer district, building department, or planning and zoning department.1
A small no-discharge lagoon "can be eligible for an exemption" from DNR construction and operating permits if it handles domestic wastewater only, at "a maximum rate of 3,000 gallons per day or less". Such a lagoon must be designed by a professional engineer licensed in Missouri.13
Installing and maintaining your system
In Boone County, a certified installer must install the system in accordance with the ordinance, and "No backfilling is allowed until final inspection is conducted". Boone County requires a soil evaluation by "a soil scientist from the certified list". "Alternative systems are required to be designed by an engineer and are generally used for sites that have poor soil or limiting conditions".4
In Jasper County, "Homeowners can install their own onsite system but all permits still have to be attained and approved before work can start". New systems there need "a soil profile to be done by a licensed soil morphologist".3
Boone County advises that you "Have the solids pumped out of your septic tank periodically," which it puts at "every 3-5 years depending on the size of the family".4 No person or property owner may operate an onsite system so as to cause a nuisance, a health hazard, or contamination of surface water or groundwater.12
When you sell the house
"For the most part, local public health agencies no longer inspect existing systems related to real estate transfer". The buyer or lender often cannot easily tell a system's condition, because "most components are underground".14 DHSS trains and licenses inspectors for third-party assessments of existing systems tied to real estate sales, and those who pass its course "will receive a Licensed Inspector ID card".15
Cities and counties with their own licenses
Christian County's health department "adopted a county-wide onsite wastewater ordinance with construction standards" in 1992.2 In Jasper County, anyone who constructs, modifies, repairs or operates a sewage treatment system needs an Onsite Sewage Treatment System Permit from the health department, a rule in place "Since September 1, 1995". Jasper County also requires "a minimum lot size of 0.92 acres per septic system," which you show with "a tax receipt, survey, or warranty deed".3
Boone County Resource Management took over onsite wastewater regulation effective June 28, 2022. It does not guarantee that permitted systems will function as designed.4
Where to complain
For complaints about an onsite system, use the DHSS Onsite Wastewater Complaints form. For city sewers and wastewater treatment plants, contact your regional Missouri Department of Natural Resources office.12 In Jasper County, "Sewage complaints need to be in writing," and the health department investigates them.3 Christian County has a Wastewater Complaints Form.2
The Attorney General's Consumer Protection section covers the sale of merchandise, which the state defines to include "service".16
Sources (16)
- Missouri Department of Health and Senior Services: Onsite Wastewater Treatment, read November 21, 2026 ↑
- Christian County Health Department: Wastewater, read November 21, 2026 ↑
- Jasper County Health Department: Environmental Services, read November 21, 2026 ↑
- Boone County Resource Management: On-Site Wastewater Systems, read November 21, 2026 ↑
- Missouri Revised Statutes section 407.705, read November 12, 2026 ↑
- Missouri Revised Statutes section 407.700, read November 12, 2026 ↑
- Missouri Revised Statutes section 407.715, read November 12, 2026 ↑
- Missouri Revised Statutes section 407.710, read November 12, 2026 ↑
- Missouri Revised Statutes section 429.012, read November 12, 2026 ↑
- Missouri Revised Statutes section 429.014, read November 12, 2026 ↑
- Missouri Revised Statutes section 407.025, read November 12, 2026 ↑
- Missouri Department of Natural Resources: Onsite Wastewater Septic Systems, read November 21, 2026 ↑
- Missouri Department of Natural Resources: Permit Exemption for Domestic Wastewater Design Guidance (PUB1319), read November 21, 2026 ↑
- Missouri Department of Health and Senior Services: Inspections Versus Evaluations, read November 21, 2026 ↑
- Missouri Department of Health and Senior Services: Professional Registration Courses, read November 21, 2026 ↑
- Missouri Attorney General: Consumer Protection, read November 12, 2026 ↑
What septic work costs in Missouri
Published national ranges for septic pumping, inspection, repair and new systems.
Septic companies in Missouri
Missouri has 532 septic companies listed, and 35 of them hold an active USDOT registration. Browse them by county, or ask for quotes and we'll pass your job to septic companies near you.
Cite this page
“Septic rules in Missouri.” NearbySepticSystems.com, updated November 20, 2026. https://nearbysepticsystems.com/mo/rules/
