Septic rules in Minnesota
What the state says about septic work, with the page each rule comes from. It's a summary of the published rules, not legal advice, and your county's health department can have rules of its own.
Updated November 20, 2026
On this page: 5 sections
Check the license before you hire
Minnesota requires a license for anyone who designs, installs, maintains, pumps, inspects, or services a septic system, except as the statute provides.1 The Minnesota Pollution Control Agency (MPCA) sets the standards for those licenses.1-2 The MPCA's own FAQ says each MPCA-licensed septic business must have at least one certified employee in each specialty area it offers.3
Jackson County's septic page links to a list of licensed septic professionals in the area.4
Permits
Jackson County requires a permit to design, install, construct, alter, extend, or repair a septic system.4
In Ramsey, a Septic Pumping Permit must be filled out and submitted to the city each time a septic tank is pumped. The permits are available for purchase at City Hall.5
Pumping and maintenance
Minnesota's rules require all solids and liquids to be pumped from a tank when the top of the sludge layer is less than 12 inches from the bottom of the outlet baffle or transfer hole, or when the bottom of the scum layer is less than three inches above it. Sludge and scum together can't be more than 25 percent of the tank's liquid capacity. Solids must come out through the maintenance hole, because removing them from any other location is not a compliant method.6
Ramsey says owners must check for leaks and measure or remove specific accumulations at least once every three years, under Minnesota Rules chapter 7080.5
Minnesota's statute defines a maintainer as a person who removes solids and liquids from and maintains and repairs components of a subsurface sewage treatment system, including but not limited to sewage, aerobic, and holding tanks.7 A maintenance activity that increases how well the soil takes in effluent must be done by a certified qualified employee or a licensed business under part 7083.0790.6
When you sell the house
The seller must tell the buyer what the seller knows about the system's compliance status, and whether, as far as the seller knows, a straight-pipe system exists. If the seller has a previous inspection report from a licensed inspection business or certified local government inspector, the seller must attach a copy to the disclosure.7
Ramsey requires a compliance inspection for any property transfer involving an individual sewage treatment system. An MPCA-licensed septic inspector must perform it, and city inspectors cannot. The seller gives the buyer a Certificate of Compliance at or before closing, and a copy of the inspection goes to the city's building division within 15 days. Pumping doesn't replace the inspection: only the tank is inspected during pumping, while the compliance inspection covers the whole system, including the drainfield. For a sale between November 1 and April 30 where the inspection can't be finished, the transfer may go ahead under an agreement that the inspection will be completed by the following June 1. In most cases, Ramsey's city code requires a non-compliant system to be brought into compliance within 12 months.5
Jackson County requires septic compliance when a bedroom addition is requested, a new dwelling is constructed, or property is sold or transferred.4
St. Louis County's Subsurface Sewage Treatment System (SSTS) Ordinance 61 requires certain steps before a sale, transfer, contract for deed, or other conveyance of land with a dwelling on it. No inspection is required if a valid Certificate of Compliance for a New-Replacement System was issued within the last 10 years, or a valid Certificate of Compliance Existing System or Notice of Nonconforming was issued within the last three years. Otherwise, an inspection is required, and the report can be obtained from a licensed SSTS inspector. A non-compliant system must be replaced within 12 months on shoreland property or 24 months on non-shoreland property. If it isn't replaced before closing, the responsible party must get an estimate from a licensed MPCA contractor, and 100 percent of the replacement cost is held in escrow at closing.8
Cities and counties with their own licenses
State law doesn't stop a city or county from requiring its own licensing or certification for people who install an on-site sewage treatment system.9 Each county must adopt septic ordinances that comply with state rule revisions within two years of the agency's final adoption, unless all towns and cities in the county have adopted the ordinances, and county ordinances must apply to all areas of the county other than cities or towns that have adopted compliant ordinances at least as strict as the county's.7
Sources (9)
- Minnesota Statutes section 115.56, read November 12, 2026 ↑
- Minnesota Statutes section 115.01, read November 12, 2026 ↑
- Minnesota Pollution Control Agency: SSTS certification and licensing FAQ, read November 21, 2026 ↑
- Jackson County: Subsurface Sewage Treatment Systems, read November 21, 2026 ↑
- City of Ramsey: Septic Systems, read November 21, 2026 ↑
- Minnesota Rules 7080.2450, subpart 3, read November 21, 2026 ↑
- Minnesota Statutes section 115.55, read November 21, 2026 ↑
- St. Louis County: Buying or Selling Property, read November 21, 2026 ↑
- Minnesota Statutes section 326B.835, read November 12, 2026 ↑
What septic work costs in Minnesota
Published national ranges for septic pumping, inspection, repair and new systems.
Septic companies in Minnesota
Minnesota has 1,004 septic companies listed, and 200 of them hold an active USDOT registration. Browse them by county, or ask for quotes and we'll pass your job to septic companies near you.
Cite this page
“Septic rules in Minnesota.” NearbySepticSystems.com, updated November 20, 2026. https://nearbysepticsystems.com/mn/rules/