Septic repair permits in Miami, FL: who issues them and the rules
Who issues septic repair permits in Miami, FL, what the application takes, how long a permit lasts, and when county sewer and replacement rules apply.
On this page: 7 sections
- 1Do I need a permit to repair a septic system in Miami?
- 2Who issues septic repair permits in Miami-Dade County?
- 3What do you need to apply for a septic repair permit?
- 4How long does a septic repair permit last, and can it be transferred?
- 5Who can do septic repair work in Miami?
- 6Do Miami-Dade's stricter septic rules apply to a repair?
- 7When does a septic repair turn into a sewer connection?
Repairing a septic system in Miami takes a permit before the work starts. Florida law requires it, and for now the Florida Department of Health's Miami-Dade County office handles septic permitting and inspection.1-2 That job is set to move to Miami-Dade County, on a date not yet published.3
Do I need a permit to repair a septic system in Miami?
Yes. Under section 381.0065(4) of the Florida Statutes, nobody may construct, repair, modify, abandon or operate an onsite sewage treatment and disposal system (OSTDS) without first getting a permit. If construction of a system starts before its permit is issued, the property owner or applicant takes on all the legal, financial and safety liabilities that follow.1
The statute's definition of an OSTDS reaches well past the tank. It names standard subsurface, filled and mound drainfields, aerobic treatment units, septic tanks, grease interceptors, pump tanks and solids or effluent pumps, along with any item used as part of the system.1
Miami-Dade County tells owners to contact a licensed and permitted septic system professional immediately if they notice odors or wet spots over the drain field area, plumbing or septic tank backups, gurgling sounds in the plumbing or slow draining fixtures. It also says never to open a septic tank yourself because of the dangerous gases and bacteria inside, and to hire a licensed professional to open and inspect it.4
Who issues septic repair permits in Miami-Dade County?
The Florida Department of Environmental Protection (DEP) is responsible for implementing the state's septic statutes and regulations. Under Florida's Clean Waterways Act of 2020, the county health department offices continue to do the permitting and inspection.2
DEP's permitting FAQ lists Miami-Dade among the counties where permits are issued by the Environmental Public Health Program of the Florida Department of Health's local county health department.5
That's set to change. On October 6, 2026 the Miami-Dade County Commission approved an agreement under which DEP delegates septic permitting and inspections in the county to Miami-Dade County, and on October 20 it adopted the ordinance that carries the delegation into the county code.3, 6 The agreement takes effect 90 days after it's signed.7 The county hasn't published a signing date, so until the agreement takes effect, the Department of Health's Miami-Dade office stays the one that permits and inspects septic systems.2-3
The Department of Health's Miami-Dade page lists its onsite sewage program at 786-654-6620, fax 305-623-3645 and HRSDOH@FLHealth.gov. Questions about the state program go to OSTDS_Feedback@FloridaDEP.gov.2
What do you need to apply for a septic repair permit?
In Miami-Dade, the application goes to the Florida Department of Health in Miami-Dade County, and its onsite sewage page says the governing authorities for the program and all forms can be found through DEP.2, 5
DEP's FAQ answers how to get a permit to construct a septic system or other OSTDS and doesn't set out a separate repair package, so check with the county office before you file. For Miami-Dade and the other counties where the health department issues permits, the FAQ asks for these items:5
- A completed Application Form (DEP4015, page 1).
- A Site Plan (DEP4015, page 2).
- A building floor plan.
- The required application fee.
- A Site Evaluation (DH4015, page 3) by a qualified professional. The county health department can do it for a fee, or you can hire a private site evaluator at your own expense.
The county health department works out the total permitting fee, including any county fees, from the type of system your property needs and the services you ask for.5 Section 381.0066 sets the limits for state fee categories that include application review, permit issuance or system inspection (repairs are named), site evaluation, evaluation of a system previously in use, and reinspection.8 Ask the county's onsite sewage program for the current amount. Environmental Health bills and fees can be paid in person, by mail or at MyFloridaEHPermit.com.2
Miami-Dade County says it has instituted more rigorous standards for new and replacement systems. If the job will replace the system, read the section below on the county's stricter rules before you file.4
An engineer-designed system follows its own track. The design has to be certified by a registered professional engineer and submitted to the county health department. The office has 5 working days to ask for anything missing from the application. Within 15 working days of a complete application, it must issue the permit or tell the applicant the system doesn't meet the performance criteria and refer the application to DEP. It may use an outside consultant for the review, with the actual cost paid by the applicant.1
How long does a septic repair permit last, and can it be transferred?
A repair permit is valid for 90 days after the date it's issued. A construction permit is valid for 18 months and may be extended once for 90 days under DEP's rules.1
If the property changes hands and the siting, location and installation conditions or repair details stay the same, a repair permit can go to the new owner. The new owner has to file an amended application with all corrected information and proof of ownership within 60 days after the transfer of ownership. There's no fee for processing that supplemental information.1
Those terms come from state law. The Department of Health's Miami-Dade page says to keep working with the county health department offices for all your permitting needs.1-2
A repair permit isn't the only 90-day period a Miami-Dade owner may face. Under Section 24-43.1(7) of the county code, an owner who gets a county Notice of Sewer Availability is required to connect to the public sanitary sewer and abandon the septic system within 90 days of being notified. The county's septic care page also says property owners must register their new or existing septic systems.4
Who can do septic repair work in Miami?
Anyone contracting to construct, modify, alter, repair, service, abandon or maintain any part of a septic system has to be registered under part III of chapter 489 of the Florida Statutes. A property owner who personally does construction, maintenance or repairs on the system serving his or her own owner-occupied single-family home is exempt from that registration but is still subject to all permitting requirements.1
Miami-Dade County adds its own requirement for tank waste. Anyone who pumps out your system and hauls the waste away must have a valid Miami-Dade County Liquid Waste Transporters permit, and the county's page links a list of permitted septic waste haulers. The same page says to hire a licensed septic system professional to open and inspect a tank.4
Owners, or contractors with the owner's authorization, have the option of hiring a private provider to perform septic inspections, and the Department of Health's Miami-Dade page says DEP has begun implementing that law.2
Do Miami-Dade's stricter septic rules apply to a repair?
DEP notes that many counties have local ordinances that may exceed state requirements.5 Miami-Dade's OSTDS ordinance took effect January 1, 2023. It creates tiered design standards based on factors such as sewage flow rates and proximity to environmentally sensitive areas, and it requires performance based technology for all new installations and for existing systems requiring replacement.4
How much of the system the job replaces decides whether the county reviews it. DERM's review covers a new system and an existing one that has to be replaced in its entirety, meaning both the septic tank and the drainfield. A repair or modification that doesn't need the whole system replaced doesn't need DERM's review or approval.9 For questions about the ordinance, the county's septic care page points to its RER-DERM Wastewater Section, and on that page DERM stands for the Department of Environmental Resources Management. The section's email address is on the county's septic system care page, and the page's About Us block lists Regulatory and Economic Resources at 305-375-2877.4
An engineer-designed performance-based system carries continuing duties. Its owner must keep a current maintenance service agreement with a maintenance entity permitted by DEP, which inspects the system at least twice a year, and must get a biennial operating permit.1 The Department of Health's Miami-Dade page lists operating permits for aerobic treatment units, performance based treatment systems, commercial septic systems and industrial or manufacturing zoned systems, under a heading saying they only apply to counties that use operating permits.2
When does a septic repair turn into a sewer connection?
Under section 381.00655(1)(b), the owner of a system that needs repair or modification to function in a sanitary manner, or to comply with the state's septic law and rules, must connect to an available public or investor-owned sewer within 90 days after written notification from the department. In hardship cases, the owner can ask for one extension of not more than 90 days.10
For a single-family home with an estimated flow of 1,000 gallons per day or less, state law treats a sewer as available when it can be connected to the home's plumbing, isn't under a DEP moratorium and has adequate permitted capacity, and a gravity line or an approved low pressure or vacuum line exists in a public easement or right-of-way that abuts the property line. Abandoning a septic system falls under the same permit requirement as repairing one.1
Miami-Dade has its own notice. A Notice of Sewer Availability (NOSA) comes from the Department of Environmental Resources Management (DERM) when the county finds a public sanitary sewer line abutting, available and operative in the right of way or in front of the property. Section 24-43.1(7) of the Code of Miami-Dade County then requires the owner to connect and abandon the septic system within 90 days of being notified. Start with the New Business Office of the Water and Sewer Department (WASD) if the property is in WASD's service area, or with the municipality that serves it, for the requirements and fees. If you're in a municipality and aren't sure whether you're on sewer, the county says to contact your local water and sewer department or check your utility bill for a sewer fee.4
To compare septic companies listed for the area, see the Miami page or request quotes.
The Florida Department of Health in Miami-Dade County, Florida DEP's permitting FAQ, Miami-Dade County's septic care page, the county's Legislative Hub and Florida Statutes sections 381.0065, 381.0066 and 381.00655, checked November 2026.
Sources (10)
- Florida Statutes section 381.0065, read November 9, 2026 ↑
- Florida Department of Health in Miami-Dade County: onsite sewage, read November 9, 2026 ↑
- Miami-Dade County Legislative Hub: matter 261729, Resolution R-861-26, read November 11, 2026 ↑
- Miami-Dade County: septic system care, read November 9, 2026 ↑
- Florida DEP: onsite sewage permitting FAQ, read November 9, 2026 ↑
- Miami-Dade County Legislative Hub: matter 261728, read November 11, 2026 ↑
- Miami-Dade County: Specific Operating Agreement with FDEP, section 17, read November 11, 2026 ↑
- Florida Statutes section 381.0066, read November 9, 2026 ↑
- Miami-Dade DERM: OSTDS Guidance Manual, section 4.3, read November 11, 2026 ↑
- Florida Statutes section 381.00655, read November 9, 2026 ↑
